BORÈL team carrying out injection and sealing work in the A9 construction pit near Amstelveen

Project

Bouwkuip A9 Amstelveen

Water ingress in concrete elements under groundwater pressure requires precise location, appropriate material selection and controlled execution.

Project summary

Structure, issue and execution.

See where BORÈL worked, the leakage problem at the site and the work carried out.

Structure
Concrete construction pit within the A9 project near Amstelveen.
Issue
Water ingress at concrete elements and connections under groundwater pressure.
Work carried out
Injection and sealing work at the identified locations in the construction pit.

Technical context

The conditions determine the approach.

The construction pit is a dynamic work zone. The method, equipment, access and interfaces with other work are therefore coordinated in detail beforehand.

Before execution, available drawings, visible damage, accessibility and relevant project conditions are brought together to create a method that is technically appropriate and practically executable.

What does this mean for your project?

Discuss the location, the leak and your schedule with BORÈL. Together, we identify the technical considerations and requirements for the work. You will know what information is needed and the next step for your situation.

Next step

A leak or damage pattern that requires certainty?

Share the structure, location and what you observe. BORÈL will discuss the information needed for a focused assessment.