Bouwkuip A9 Amstelveen
Water ingress in concrete elements under groundwater pressure requires precise location, appropriate material selection and controlled execution.
Project summary
Structure, issue and execution.
See where BORÈL worked, the leakage problem at the site and the work carried out.
- Structure
- Concrete construction pit within the A9 project near Amstelveen.
- Issue
- Water ingress at concrete elements and connections under groundwater pressure.
- Work carried out
- Injection and sealing work at the identified locations in the construction pit.
Technical context
The conditions determine the approach.
The construction pit is a dynamic work zone. The method, equipment, access and interfaces with other work are therefore coordinated in detail beforehand.
Before execution, available drawings, visible damage, accessibility and relevant project conditions are brought together to create a method that is technically appropriate and practically executable.
What does this mean for your project?
Discuss the location, the leak and your schedule with BORÈL. Together, we identify the technical considerations and requirements for the work. You will know what information is needed and the next step for your situation.
More projects
View other technical challenges.
Compare the structure, issue and execution to quickly identify experience relevant to your situation.
Tunnel Julianaplein Groningen
Local leaks in a tunnel structure require an approach that accounts for water exposure, accessibility and the function of the asset.
View this project
Station Nunspeet
A leak in a station environment requires targeted repair with attention to accessibility, continued use and safe execution.
View this projectNext step
A leak or damage pattern that requires certainty?
Share the structure, location and what you observe. BORÈL will discuss the information needed for a focused assessment.