Ga direct naar de hoofdinhoud

Available throughout the Netherlands for complex concrete structures Available 24/7 050 204 13 50

BORÈL specialist performing injection work on a concrete structure near Nunspeet station

Project

Station Nunspeet

A leak in a station environment requires targeted repair with attention to accessibility, continued use and safe execution.

Project summary

Structure, issue and execution.

See where BORÈL worked, the leakage problem at the site and the work carried out.

Structure
Concrete structure in the station environment of Nunspeet.
Issue
Leaks at parts of the structure.
Work carried out
Local injection work at the locations where water ingress was identified.

Technical context

The conditions determine the approach.

At a location that remains operational, clear work boundaries, manageable planning and good communication with all parties are essential.

Before execution, available drawings, visible damage, accessibility and relevant project conditions are brought together to create a method that is technically appropriate and practically executable.

What does this mean for your project?

Discuss the location, the leak and your schedule with BORÈL. Together, we identify the technical considerations and requirements for the work. You will know what information is needed and the next step for your situation.

Next step

A leak or damage pattern that requires certainty?

Share the structure, location and what you observe. BORÈL will discuss the information needed for a focused assessment.